Skip to content

Make-Ready Engineering

Make-ready determines whether an attachment can be built — and a fail flag without a resolution stalls the whole project.

We analyse each structure and return specific, buildable make-ready — transfer, re-tension, guy, anchor or replacement — with framing called out. Every deliverable is produced to your standard and checked before it reaches your reviewer — see how we work and our quality process.

Scope
  • Structural analysis of shared poles
  • Make-ready determination
  • Transfer, re-tension, guy and anchor design
  • Clearance resolution
  • Make-ready drawings and cost line items
Deliverables
  • Make-ready notes
  • Structure drawings
  • Loading results
  • Cost line items
Worked to

NESC clearances · CSA C22.3 · Distributor attachment standards

Questions

Common questions

What does your make-ready include?

A specific, buildable resolution per structure — transfer, re-tension, guy or anchor change, or replacement — with framing and clearances.

Do you produce make-ready cost line items?

Yes, itemised for estimating.

Request a quote

Make-Ready Engineering for your next project.