Utility distribution design in Florida
Florida's hurricane exposure drives extensive storm-hardening and undergrounding, with strong demand for structural analysis and construction drawings. We support Florida utilities and their engineering partners remotely — designing and drafting to the NESC (National Electrical Safety Code) plus the utility's construction standard and state PUC requirements. IST is 9.5–10.5 hours ahead of Eastern Time.
Work for Florida is produced to the NESC (National Electrical Safety Code) plus the utility's construction standard and state PUC requirements, and to your own construction and CAD standards.
Florida Power & Light (FPL) · Duke Energy Florida · Tampa Electric (TECO)
Referenced for context only. SPANEX is an independent production partner and is not affiliated with these utilities.
Florida, answered
Do you work to Florida's standards?
Yes. We design and draft to the NESC (National Electrical Safety Code) plus the utility's construction standard and state PUC requirements, plus your own CAD standard. Your licensed professional reviews and seals the work.
Can you support utilities in Florida from a remote team?
Yes. We work with Florida utilities and their engineering partners entirely remotely — you send scope and standards, and receive documented, review-ready packages. IST is 9.5–10.5 hours ahead of Eastern Time.
Which Florida utilities have work like this?
Distribution design and drafting of this kind supports networks such as Florida Power & Light (FPL), Duke Energy Florida, Tampa Electric (TECO) and their consultants. We are an independent production partner and are not affiliated with these utilities.
Distribution design support in Florida.